The Cost Effective Structurally Insulated Panel

Tel: 029 2047 1053  |  Email: info@mibmetsip.com

Olympic Village

Project: Olympic Village

Location: London Athlete's Village

Type: Sports Accommodation

Client: EJ Horrocks

Area: 1800m2 of the 86mm MetSIP Infill Panel

Started: April 2010

Scope of Works: This was a supply only project for MIB MetSIP, where 1800m2 of the 86mm MetSIP Infill Panel was supplied for use across 12 floors between a concrete structure infill. This project is for the accommodation blocks in the London 2012 Olympic Games, Athletes Village.

 

Sectors: Leisure

Tags: Olympic, Village, London, Athletes, Village

The MIB MetSIP Panel — the simple structural solution.