The MIB MetSIP Panel has a 20 year history of development and construction.
I wanted to say a big thank you to MIB MetSIP for all their hard work on the TSB Retrofit project. We were really excited to build an extension using their SIPS panels as this was a product we had never used before. Dean Bennett was really knowledgeable and helped us throughout the build. I would wholeheartedly recommend MIB MetSIP as their experience and customer care has been exceptional.
Meg Smith, Planned Maintenance Team, Charter Housing Association.
MIB MetSIP Panels allowed us to complete the shell in just 10 weeks, instead of the 22 if traditional blockwork had been installed. We were so pleased that we have since specified MIB MetSIP Panels on a number of other projects.
Galway Bay Golf & Country Club, Ken McBride, Building Concepts
The panels on each floor were installed prior to the brickwork providing a watertight structure upon installation of the windows. This allowed finishes to commence earlier in the sequence.
Holiday Inn Express, Richard Upsall, Ballast Wiltshire
A three quarter reduction in the programme period has been achieved on a Balfour Beatty hospital contract through the use of pre-formed panels. The panels have produced a cost saving of 25% for Balfour Beatty, compared with the use of using brick and blockwork, on top of thousands of pounds of savings on preliminaries achieved through reduction in time.
Fazakerely Hospital, Contract Journal
MIB MetSIP Panels helped us to significantly reduce the time it took to reach a stage whereby we were able to get buildings roofed in and commence the first fix installation.
Giles Dixon, Clarendon Properties